As you may have already read, our work on this property included a
complete roof, gutter and trim replacement. You can see some of the
improvements Shiner Roofing completed on North Kensington Street in
Arlington, VA by taking a
look at the stunning before and after images or you can explore the project
details in their full extent below.
|
|
|
Upper Exterior Front Renovation:
|
|
·
|
Removed existing gable, siding gutters and wrap on front dormer.
|
|
·
|
Removed roof deck at staggered joint 4’ back from edge.
|
|
·
|
Built ladder frame 10” extension and attached to gable.
|
|
·
|
Extended roof deck at staggered joint 2’ and 4’ back from roof edge.
|
|
·
|
Installed two James Hardie smooth surface sheets as backer.
|
|
·
|
Framed two returns. Installed
Azek 1x6 trim on rakes.
|
|
·
|
Installed four vertical Azek 1x6 batten boards.
|
|
·
|
Installed Azek 1x6 trim on returns.
|
|
·
|
Installed
James Hardie soffit panels on rake.
|
|
·
|
Installed Azek 1x8 Band board at bottom of triangular gable.
|
|
·
|
Installed two basic Fascia Accents.
|
|
·
|
Installed Azek
1x6 trim on eaves where gutter is.
|
|
|
|
| |
|
Lower Exterior Front Renovation:
|
|
·
|
Framed roof and soffit across front between two roofs along brick.
|
|
·
|
Installed ½” CDX plywood roof deck.
|
|
·
|
Installed Azek 1x6 eave fascia.
|
|
·
|
Installed Azek 1x6 Frieze below soffit.
|
|
·
|
Installed
James Hardie soffit panels.
|
|
·
|
Installed copper apron flashing where shingles join wall.
|
|
|
|
| |
|
Gutters
|
|
·
|
Removed existing gutters and downspouts.
|
|
·
|
Inspected existing fascia boards (advised homeowner of any
necessary/recommended repair or replacement and additional costs).
|
|
·
|
Installed new (6”) ‘K’ style seamless aluminum gutters (.032).
|
|
·
|
Installed new oversized (3x4) downspouts to match current
configurations.
|
|
·
|
Installed new gutters with hidden hangers.
|
|
·
|
Re-installed previously removed vinyl gutter screens (homeowner was
made aware
that some may be damaged upon removal).
|
|
·
|
Caulked and sealed all end caps (as necessary).
|
|
·
|
Cleaned premises; hauled away any job-related debris.
|
|
|
|
| |
|
Roof & Gutter Replacement
|
|
·
|
Tore off (2) layers of old shingles and underlayment down to
substrate.
|
|
·
|
Inspected existing wood deck condition and advised the owner of any
necessary/recommended repair or replacement of decking and
additional costs.
|
|
·
|
Installed CertainTeed sand-surfaced Winterguard along all gutter
lines, walls, penetrations, chimneys and valleys (per building
codes and manufactures recommendations).
|
|
·
|
Installed new white F5 aluminum drip edge along all gutter eaves and
rake edges.
|
|
·
|
Installed shingle starter strip at all eaves per manufactures
specifications.
|
|
·
|
Installed new Roofer’s Select underlayment over remaining surfaces.
|
|
·
|
Cut-in and installed new DCI Smart Vent along front and rear eaves for
proper intake ventilation.
|
|
·
|
Installed new laminated asphalt shingles using 4 (1.25”) nails per
shingle in accordance with manufactures specifications.
|
|
·
|
Installed 2 rows of #100 copper snow guards approximately 1’ apart in a
staggered pattern (45 in total).
|
|
·
|
Replaced all pipe collars with new Pro-Flash painted aluminum pipe
collars embedded in asphalt roof cement.
|
|
·
|
Installed new copper step flashing along all surfaces where copper
counter is to be installed.
|
|
·
|
Installed new Pro-Flash custom formed copper counter flashing at front
chimney, along front apron (to be built), along garage walls.
|
|
·
|
Installed new valleys using the closed-cut valley method per
manufactures specifications.
|
|
·
|
Painted plumbing stack(s)/furnace stack(s).
|
|
·
|
Cut-in and installed new Shingle Vent II hidden ridge vent along main
ridge and garage ridge line for proper exhaust ventilation.
|
|
·
|
Installed new accessory shingle ridge caps to match field shingle.
|
|
·
|
Installed plywood over existing gable vents to maintain proper circulation.
|
|
·
|
Caulked and sealed all flashings with Vulkem 116 polyurethane sealant.
|
|
·
|
Cleaned gutters and nailed in existing gutter spikes.
|
|
·
|
We ran a magnet over premises to pick up loose nails.
|
|
·
|
Cleaned premises and hauled away all job-related debris.
|
|
·
|
Evaluated premises for final review.
|
Shiner Roofing, Siding and Windows has made quite a change on North
Kensington Street! What can we do for you? Contact Shiner today for a free,
no obligation home improvement estimate.